What should I provide for an engineering review?+
Start with the application, load profile, voltage, capacity or runtime target, installation dimensions and environment. Add controller and charger details when available. Explain which drawings or 3D requirements you need to share on the contact page.
Can the BMS be adapted to our controller?+
The development scope is agreed around the actual controller and signals. Define the interface, protocol, control states, update timing and failure behavior, then validate the implementation with your equipment.
Does every pack undergo every qualification test?+
No. Each supplied pack has corresponding final inspection data. Routine inspection and burn-in follow the agreed production process; environmental or other qualification reports apply to the tested model and conditions. Additional reports are selected for the project.
Are UN 38.3, CE documentation and an SDS the same thing?+
No. They serve different purposes. Transport test summaries, applicable conformity documentation and safety data should be identified separately for the model and destination. Ask the team to define the document package your project requires.